Medyka: road resurfacing may slow traffic from April 24

Editor: Polish Border Guard
Aerial drone top down photo of urban multilevel highway junction with light traffic
Shutterstock / contributor 228984501 (shutterstock-standard)

Drivers using the Medyka road crossing (paired on the Ukrainian side with Shehyni) should expect possible delays as the road surface is replaced. Work begins on April 24, 2026 and is expected to last about 10 weeks.

Who is affected:

The resurfacing covers traffic in both directions, so allow extra time when planning your crossing.

  • Trucks leaving Poland
  • Trucks entering Poland
  • Cars leaving Poland
  • Cars entering Poland
🇵🇱 Poland:
  • Start of works: 24.04.2026
  • Estimated duration: about 10 weeks
  • Temporary lane narrowing is possible
Practical advice:

While works continue, consider nearby crossings to avoid the busiest periods. Always check current wait times before you set off — for example on the Shehyni checkpoint page.

Keep an eye on other changes at this crossing too, such as the bus clearance updates in Medyka.

Source: Polish Border Guard

This report is compiled automatically from our monitoring data; the analysis is written with the help of artificial intelligence. The editor is responsible for corrections.

Translated automatically from the Ukrainian original and checked by our editorial team. The Ukrainian version is authoritative.

Report a translation problem

Updated