A10 Berlin ring closed from Monday 30 November. Full closure lasts 6 hours

Editor: Die Autobahn GmbH des Bundes (German motorway operator)
Road under construction closed with a wooden beam and a red and white road sign. The road is located on top of newly built Dutch dike. In the background is a field of cabbage cultivation.
Shutterstock / contributor 228984501 (shutterstock-standard)

A10 night closure between Dreieck Barnim and Dreieck Spreeau, 30 November to 1 December

The A10 will be under a full closure (Vollsperrung) from Monday, 30 November 2026, 22:00 to Tuesday, 1 December 2026, 04:00 (Berlin time), on the sections Kranichberge - Freienbrink and Spreeau - Erkner. The closure lasts 6 hours and affects all trucks and travellers using the eastern Berlin ring in both directions between Dreieck Barnim and Dreieck Spreeau, so check the live traffic and closures map before you plan this night trip.

Key facts

  • Road: A10
  • Type: full closure of the carriageway (Vollsperrung)
  • Section 1: Kranichberge - Freienbrink, direction Dreieck Barnim to Dreieck Spreeau
  • Section 2: Spreeau - Erkner, direction Dreieck Spreeau to Dreieck Barnim
  • Start: Monday, 30 November 2026, 22:00 (Berlin time)
  • End: Tuesday, 1 December 2026, 04:00 (Berlin time)
  • Duration: 6 hours
  • Days until the closure starts: 6
  • Whole construction measure ends: 1 December 2026
  • Source: Die Autobahn GmbH des Bundes (autobahn.de)

Detour

No official detour has been published for either section. Follow the local diversion signs on site and check the closures map before departure.

What it means for trucks and Poland-bound traffic

The A10 is the Berlin ring road that links the A12 to the Świecko border crossing and the A11 to the Kołbaskowo border crossing. Drivers heading to or from Poland on these routes who use the eastern part of the ring during the closure window must plan their route through Germany around both closed sections. The closure covers Kranichberge - Freienbrink towards Dreieck Spreeau and Spreeau - Erkner towards Dreieck Barnim.

Other closures in the next days

  • A4: Tuesday 24 November, 19:00 to Wednesday 25 November, 05:00, 10 hours, Am Wacheberg - Görlitz
  • A1: Friday 27 November, 22:00 to Monday 30 November, 05:00, 55 hours, Bramsche - Lohne/Dinklage

Planning tips

Check the live map before departure. Closures can be moved, shortened, extended or cancelled at short notice. Respect the weekend and holiday driving bans (Fahrverbot) when you plan the trip around the closure. If your route continues to other countries, also check the Czech traffic ban calendar and the Hungary road bans for 2026.

If you need to stop before the closure ends, use the truck parkings map to plan your rest period. Use the map of fuel stops for lorries in Europe to plan refuelling on the route.

Useful tools for truck drivers

Source: Die Autobahn GmbH des Bundes (autobahn.de) | Updated: 24.11.2026

This report is compiled automatically from our monitoring data; the analysis is written with the help of artificial intelligence. The editor is responsible for corrections.

Translated automatically from the Ukrainian original and checked by our editorial team. The Ukrainian version is authoritative.

Report a translation problem

Updated